G.A. Solar closed a major operation for the construction of two photovoltaic plants in an amount of 120 million euros, financed through a loan closed with Banesto, BBVA, Caja Madrid and La Caixa.
The total projected solar parks a total of 20.6 MWp. The first is located in Benahadux (Almería) and has a capacity of 11.7 MWp. The other is located in Calasparra (Murcia), with a total of 8.9 MWp. The entry into operation of both plants was in August 2008, entering into the RD 661.